dirtpusher wrote:
Why do you lie
YOUR COMMENT IS TRULY DERANGED! Before you run your uninformed mouth and call someone a liar, you need to actually know what the heck you are talking about!
There is, to the best of my knowledge and from public records not one major point I made that is untruthful or not backed by factual data. My statements were (in italics):
1. “
Correct, Sir! And it was rumored the oil could even be purchased from a friendly Northern neighboring country! “
>This is correct>. The oil WAS going to be purchased from Canada. They are still located to the North of the conterminous united states. They ARE still friendly (for the most part).
2. “
There is a considerable quantity already flowing through the Canada-US pipeline which delivers to a distribution-point in Oklahoma, thereafter piped to South Texass refineries. “
>This is correct>. Oil is being delivered by the Keystone pipeline.
SOURCE:
https://en.m.wikipedia.org/wiki/Keystone_Pipeline.
“TransCanada Keystone Pipeline GP Ltd, abbreviated here as Keystone, operates four phases of the project. In 2013, the first two phases had the capacity to deliver up to 590,000 barrels (94,000 m3) per day of oil into the Midwest refineries. Phase III has capacity to deliver up to 700,000 barrels (110,000 m3) per day to the Texas refineries.”
MAP OF CURRENT KEYSTONE PIPELINE (with proposed XL extension in Green):
https://upload.wikimedia.org/wikipedia/commons/thumb/1/1a/Keystone-pipeline-route.svg/1200px-Keystone-pipeline-route.svg.pngCURRENT STATUS:
Keystone Pipeline (Phase 1): From Hardisty, Alberta, Passes through Regina, Saskatchewan, Steele City, Nebraska to Wood River, Illinois and to Patoka, Illinois.
Status: Complete. IN OPERATION. Construction started: Q2 2008. Commissioned: June 2010. Length: 3,456 km (2,147 mi). Maximum discharge: 0.86 million barrels per day. Diameter: 30 in (762 mm). No. of pumping stations: 39.
Keystone-Cushing Project (Phase 2). From Steele City, Nebraska to Cushing, Oklahoma.
Status: COMPLETE. IN OPERATION. Construction started 2010. Commissioned: February 2011. Length: 468 km (291 mi). Diameter: 36 in (914 mm). No. of pumping stations: 4.
Cushing Marketlink Project (Phase 3a). From: Cushing, Oklahoma. Passes through Liberty County, Texas to: Nederland, Texas.
Status: COMPLETE. IN OPERATION. Construction started: Summer 2012. Commissioned: January 2014. Length: 784 km (487 mi). Maximum discharge: 0.7 million barrels per day. Diameter: 36 in (914 mm).
Houston Lateral Project (Phase 3b). From Liberty County, Texas to Houston, Texas.
Status: COMPLETE. IN OPERATION. Construction started: 2013. Commissioned: 2016, online 2017. Length: 76 km (47 mi).”
3. “
The Keystone XL portion would have completed a section from Alberta through to Baker, MT, where it would have been mixed with Bakken Formation shale oil, and the resulting higher API gravity oil pumped down to refineries near the Southern coast.”
>This is correct>.
Keystone XL Pipeline [PROPOSED ONLY — Cancelled by Biden] (Phase 4). From: Hardisty, Alberta. Through: Baker, Montana to Steele City, Nebraska.
Status: CANCELLED. Length: 1,897 km (1,179 mi). Diameter: 36 in (914 mm). SOURCE. Link as above r.e. Pipeline.
4. “
A problem is the Canadian oil API gravity is very low, (8 > 14 < 20 API gravity) and more suitable for refining into Plastics than fuel (gasoline); although some might be refined to Number 2 Diesel. [unusable for road-fuel].”
>This is correct>. The Canadian Oil Sand oil DOES have a low American Petroleum (API) gravity measurement. The oil IS more suitable for refining into plastics and similar products due to the higher degree of polymerization and Bitumin content. SOURCE:
http://refineryreport.org/tar-sands.php