Ugly Hedgehog - Photography Forum
Home Active Topics Newest Pictures Search Login Register
General Chit-Chat (non-photography talk)
High River Public Works
Feb 7, 2015 12:07:46   #
joehel2 Loc: Cherry Hill, NJ
 
Only an engineer could love this!!!

For those with manpower but not machinery available to them, here’s a construction technique that would be handy to know.
Read the calculations below then click on the link at the bottom of the article to see this technique in action.

Below is a link to a short video of a Pakistani pile driving construction technique. Notice that the pile driving becomes effective when the extra man jumps on.

Now, let's analyze the Engineering here:

6 men x 180 lbs = 1080 lbs static force.

Jumping up and down will create a 3 times dynamic effect = 3240 lbs/jump = 1.6 ton thumps if the pile is tapered to 2 in x 2 in, cross section at the tip = 4 sq. in.

So, dynamic pressure/thump at pile tip = 3240/4 = 800 psi.

"Add a man" feature will increase to 950 psi, so buy the option!

Increase the chant and dynamic force goes up to 5 times to bring max. pressure/thump to 1600 psi for a 7 man team.

Quite good, and will penetrate hard clay and sandy soil but not hard rock! Pretty ingenious.

The foreman is the guy on the tambourine.

http://www.youtube-nocookie.com/embed/cFb0nLCKypg?rel=0

Reply
Feb 8, 2015 09:39:41   #
jkoar Loc: The Gunks, NY
 
Who'da thunk!

Reply
Feb 8, 2015 10:23:49   #
Jolly Roger Loc: Dorset. UK
 
Necessity is the mother of invention.

Reply
If you want to reply, then register here. Registration is free and your account is created instantly, so you can post right away.
General Chit-Chat (non-photography talk)
UglyHedgehog.com - Forum
Copyright 2011-2024 Ugly Hedgehog, Inc.