Ugly Hedgehog - Photography Forum
Home Active Topics Newest Pictures Search Login Register
Trains
Rotary OY Snow Blower-Cumbres & Toltec Scenic Railroad
Nov 5, 2019 19:14:56   #
Jay Pat Loc: Round Rock, Texas, USA
 
The Cumbres & Toltec Special Projects is preparing OY to run at end of next Feb/first of March.
The OY has not run since the 1990's.
The Friends of the CTSRR have been working on the OY with the structure part replacing wood parts.
The special projects dept is working to the the boiler/steam engine/rotary blades working.
This will be a special run to blow some snow!
This kicking off the Cumbres & Toltec Scenic RR's 50th anniversary celebration.

The following is a facebook link.
Air testing the cylinders/blower for operation.

https://www.facebook.com/DRG168/videos/572574063490078/?t=44

The big 50th celebration will be the last week of Aug 2020.
If there was ever a great/best time to visit, this will be it.
The event details will be announced later. I'm hearing some very cool stuff being planned!!!!
Watch the CTSRR web site (I'm guessing in May.......). There is nothing on the web site right now
https://cumbrestoltec.com/

Reply
Nov 5, 2019 22:39:25   #
fredpnm Loc: Corrales, NM
 
Very Cool Pat, thanks...I'm surprised but pleased that have already gotten to this stage of the restoration.

Reply
Nov 6, 2019 08:12:31   #
Rich1939 Loc: Pike County Penna.
 
Jay Pat wrote:
The Cumbres & Toltec Special Projects is preparing OY to run at end of next Feb/first of March.
The OY has not run since the 1990's.
The Friends of the CTSRR have been working on the OY with the structure part replacing wood parts.
The special projects dept is working to the the boiler/steam engine/rotary blades working.
This will be a special run to blow some snow!
This kicking off the Cumbres & Toltec Scenic RR's 50th anniversary celebration.

The following is a facebook link.
Air testing the cylinders/blower for operation.

https://www.facebook.com/DRG168/videos/572574063490078/?t=44

The big 50th celebration will be the last week of Aug 2020.
If there was ever a great/best time to visit, this will be it.
The event details will be announced later. I'm hearing some very cool stuff being planned!!!!
Watch the CTSRR web site (I'm guessing in May.......). There is nothing on the web site right now
https://cumbrestoltec.com/
The Cumbres & Toltec Special Projects is prepa... (show quote)



Pat, I learned this AM that test was made using compressed air.
I'm looking forward to seeing it actually steamed up
Rich

Reply
 
 
Nov 6, 2019 08:31:55   #
Jay Pat Loc: Round Rock, Texas, USA
 
Rich1939 wrote:
Pat, I learned this AM that test was made using compressed air.
I'm looking forward to seeing it actually steamed up
Rich


Rich, have you been inside one of the snow blowers?
I was able to get inside this one this past summer.
Pat

Reply
Nov 6, 2019 08:39:23   #
Rich1939 Loc: Pike County Penna.
 
Jay Pat wrote:
Rich, have you been inside one of the snow blowers?
I was able to get inside this one this past summer.
Pat


Pat you are a fortunate man!
No I never did have that experiance

Reply
If you want to reply, then register here. Registration is free and your account is created instantly, so you can post right away.
Trains
UglyHedgehog.com - Forum
Copyright 2011-2024 Ugly Hedgehog, Inc.